Thickener upgrades to help you achieve your sustainability and production targets
Additional bridge elements & reinforcements to accommodate addition weight/forces
Leading design & process principles
Standardized upgrade elements
Increased rake tork improves production
- Improves capital efficiency
- Improves operational stability
- Extends availability
- Increases rake torque
- Provides a safer work environment
- Improves availability of spare parts
Bridge and mechanism modernizations can replace all internal elements of your thickener, including bridge, gearboxes, drive units, rakes, and torques shafts or cages.
- The latest equipment design takes into consideration improved safety and maintenance features
- Enables reusing existing tank and supports
The Feed system is usually upgraded as part of this upgrade, unlocking benefits of the latest feed technologies such as Reactorwell™ to improve water recovery, reduce flocculant consumption and optimize mineral recovery at increased throughputs
- Engineering Study
- The upgrade, may include:
- Bridge, full-span, or center column
- Drive assembly, gearbox, and rake lift
- Powerpack
- Control panel
- Instrumentation
- Overflow launder and box
- Underflow cone
- Reactorwell TM Feed system upgrade